Why do some architects take homeowner's money to design projects without confirming the set aside target budget range? They often produce plans that are incomplete and leave it to the contractor to come up with the rest of the details by making assumptions and using allowances. Then when bid prices come in over the homeowner's budget the contractor is blamed.
The Contractor Coaching Partnership Blog
Architect design for attic remodel incomplete, over homeowner budget
Posted by Mark Paskell on Thu, Jun 26, 2014 @ 06:14 PM
Tags: design build
Contractor client takes care of a neighbor using design build process
Posted by Mark Paskell on Mon, Aug 12, 2013 @ 10:11 PM
Early this year my neighbor asked me if I could help him with his second story family room addition project. He actually asked me to build it but I assured him I was not a contractor but the contractor business coach who coaches and mentors remodelers and trades.
Tags: design build
EMNARI Design Build Seminar @ Sterritt Lumber; 2 CEU 4 Contractors
Posted by Mark Paskell on Tue, Apr 16, 2013 @ 11:50 AM
Tags: design build